Skip to content

Zensical Post-Cutover Verification Checklist

Use this checklist right after cutover to verify production quality and detect regressions early.

Run metadata

  • Date:
  • Verification owner:
  • Migration PR:
  • Live site URL:
  • Incident channel:

1) Availability checks

  • [ ] Site loads successfully on desktop.
  • [ ] Site loads successfully on mobile.
  • [ ] No 5xx errors on key pages.
  • [ ] TLS/HTTPS works correctly.

2) Navigation and content checks

  • [ ] Home page renders correctly.
  • [ ] Core navigation sections are present.
  • [ ] Key study pages resolve without broken links.
  • [ ] Search returns expected high-priority pages.

3) Functional checks

  • [ ] Footer navigation behavior works on mapped pages.
  • [ ] Timeline and image assets render.
  • [ ] Template pages are accessible and readable.
  • [ ] Reading/study path pages remain intact.

4) Stability checks

  • [ ] No new critical errors in workflow logs.
  • [ ] Monitoring window completed without critical incidents.
  • [ ] Decision log updated with outcome.

5) Outcome

  • [ ] Verification successful
  • [ ] Follow-up fixes required
  • [ ] Rollback required